Pad Footing Paling (Fence) Particle Board Flooring Parting Wall Patio Pergola Permanent Formwork Perpend Picture Rail Pier Pier and Beam Pillar Pitch (Roof) Planter Plasterboard Plate (Timber) Pointing (Brick work) Pointing (Roof Tiling) Portico Prefabrication Prime Cost Items (PC Items) Priming Coat Profile Provisional Sum Purlin
Courtesy of Home Renovation & Building Checklists
|
                         
Glossary terms for letter 'p'


Pad Footing An isolated footing to spread concentrated loads.

 Concreters
|
|




Particle Board Flooring A board manufactured for the use of flooring. Does not deteriorate when exposed to moisture.

 Carpenters & Joiners
|
|


Parting Wall The wall between two adjoining buildings.
|
|






Permanent Formwork Formwork which is left permanently in position after the concrete has been poured.

 Concreters
|
|


Perpend The vertical joint of mortar between adjacent masonry elements.
|
|


Picture Rail A moulded rail fixed to internal walls around door height.
|
|


Pier A column, supporting a vertical loads from a superstructure.
|
|


Pier and Beam A footing system used for reactive soil.
|
|


Pillar A freestanding vertical column.
|
|






Plasterboard A rigid, insulating board made of gypsum plaster. Used for the interior lining of walls and ceilings.
|
|


Plate (Timber) A horizontal member of a timber frame, that distributes the load to the walls and floors.

 Carpenters & Joiners
|
|








Prefabrication The manufacture of standardised component in a factory delivered and installed on site.

 Carpenters & Joiners
|
|


Prime Cost Items (PC Items) An amount specified in the contract documents for particular supply items, such fixtures or fittings.
|
|


Priming Coat The first coat applied to an unpainted surface, to bond future coats. It also inhibits deterioration of surface.

 Painters, Paint Stores
|
|


Profile The cross sectional face of moulded building element, eg. cornices architrave’s etc.
|
|