Hacking The roughening of a concrete or plaster surface to provide a key new layers.

 Plasterers, Concreters
|
|


Hand Over The formal handing over of the building for occupation.
|
|




Head Contract A contract is signed between the contractor and the principal.
|
|


Head Contractor The principal contractor who has full responsibility including subcontracting for the completion of works.
|
|


Header A masonry unit laid with its longest length across the width of a wall.
|
|


Header Course An external course of masonry units placed as a feature to define a building element such as on top of window opening.
|
|








Hob The brickwork which is placed above the floor level around a fireplace or the outside of a shower recess.

 Bricklayers / Brick Makers
|
|


Hoist A mechanical device which transports building material from the ground level to upper floors.
|
|




Honeycombing A concrete defect, resulting in a rough surface due to air voids and aggregates showing.

 Concreters
|
|


Hoop Iron A strip of galvanized steel, which may be used for straps.