homeone.com.au

Australia & New Zealand's
home building resource

 
YOU ARE HERE:
Australia & New Zealand > Glossary

GLOSSARY TERMS
Earthworks
Easement
Easing
Eaves
Eaves Lining
Edge Beam
Elbow
Electrician
Elevation
Engineer
Environmental Impact Study
Expansion joint
Extension Of Time




Courtesy of
Home Renovation & Building Checklists



Glossary terms for letter 'e'


Earthworks
All operations involved in of earth, soil or rock.


Excavating & Earth Moving Contractors


Easement
An portion of land reserved by law for a specific use or purpose.


Easing
The process of planing edges of doors and windows which are too tight in their frames.


Carpenters & Joiners


Eaves
The lower part of roof projecting beyond the wall face; usually finished with a fascia board.


Carpenters & Joiners


Eaves Lining
Sheeting fitted as lining material to the eaves.


Carpenters & Joiners


Edge Beam
A concrete beam at the edge of a concrete slab to provide additional structural strength.


Concreters


Elbow
A pipe fitting used to change the direction of a pipeline.


Plumbers & Gasfitters


Electrician
A licensed tradesperson who installs or repairs electric circuit wiring, appliances or equipment.


Electricians & Electrical Contractors


Elevation
A side view of the facade of a building.


Engineer
A person who is qualified and registered to carry out investigation, analysis and design engineering works.


Building Consultants


Environmental Impact Study
A assessment of existing environmental conditions and the likely effect of the introduction of a proposed development.


Building Consultants


Expansion joint
A control joint in construction which permits movement due to thermal effects.


Extension Of Time
An extension of the contract period granted to a contractor. The conditions for an extension of time are stated in the conditions of contract.







1300 664 569
+61 3 8685 8208 (International)


PO Box 55
Richmond VIC 3121
Australia


Monday to Friday AEST 9am - 5pm
Closed Australian Public Holidays